STG

FILM PRODUCTION OFFICE - 1/2
Light renovation (2010 - 2011)

A film production company wanted to open up its offices to the south, towards an interior garden it had acquired within the block. A high masonry wall needed to be pierced, on which the stages of the building’s transformation were visibly marked.

In this intervention, we also sought to reinforce the perception of the wall's weight, on the one hand by recessing the two new windows and, on the other, by using concrete sunshades. The supports for these were also concealed in the masonry, so as not to visually interrupt the load descent.

FILM PRODUCTION OFFICE - 2/2

Photographs: Marie-Françoise Plissart ©

General construction company: RD Construct
Health and safety coordination: SecuriSan SRL
Stability: Olivier Halliez

FILM PRODUCTION OFFICE - 1/2
Light renovation (2010 - 2011)

A film production company wanted to open up its offices to the south, towards an interior garden it had acquired within the block. A high masonry wall needed to be pierced, on which the stages of the building’s transformation were visibly marked.

In this intervention, we also sought to reinforce the perception of the wall's weight, on the one hand by recessing the two new windows and, on the other, by using concrete sunshades. The supports for these were also concealed in the masonry, so as not to visually interrupt the load descent.

FILM PRODUCTION OFFICE - 2/2

Photographs: Marie-Françoise Plissart ©

General construction company: RD Construct
Health and safety coordination: SecuriSan SRL
Stability: Olivier Halliez

STG